Independent analysis by a PPS parent, not an official Portland Public Schools product. It may contain errors. Check PPS's own materials: the Rightsizing scenarios page and the October 6, 2026 Board of Education meeting materials. Built with AI, directed by a PPS parent (how).

← Sabin: Sabin open vs the better plan

The better plan: move Tubman to where its kids are

These are best effort boundaries. NOT REAL PLANS, yet.

Harriet Tubman Middle School sits at the edge of a freeway and at the edge of the kids it serves. The Vernon building, about 2 miles northeast, fixes both, and PPS has wanted to move Tubman for five years.

Our model, 2031-32; the walk maps are study estimates