Independent analysis by a PPS parent, not an official Portland Public Schools product. Official material: PPS rightsizing scenarios and October 6, 2026 Board of Education meeting materials. Built with AI, directed by a PPS parent (how).
Durability and school sizes
A projection, not a forecast: each plan’s lines stay fixed while enrollment follows Portland State University’s July 2026 forecast.
At target means a school’s enrollment is between its floor () and its building capacity. Definitions · size targets.
Schools at target, year by year
Show:
Same numbers as a table
School by school
One school, year by year
Projected enrollment for one school under each plan. The shaded band is the school’s size range, from its floor to its building’s capacity. Filled dots are our model; open squares are PPS’s own Family Guide projections. For actual enrollment since 2018-19 and PSU’s forecast to 2035-36, see the School by school page.