---
title: "Irvington Accessibility Summary (Ankrom Moisan Architects for PPS, August 2009)"
url: "https://www.pps.net/cms/lib/OR01913224/Centricity/Domain/58/Facility%20Accessibility%20Summaries/Irvington_Ability_Sum.pdf"
archived_copy: "https://web.archive.org/web/20170903104351/https://www.pps.net/cms/lib/OR01913224/Centricity/Domain/58/Facility%20Accessibility%20Summaries/Irvington_Ability_Sum.pdf"
retrieved: "2026-10-26"
source_type: "PPS consultant report (1-page PDF). Original URL now returns 404; text taken from the Internet Archive copy captured 2017-09-03."
publisher: "Portland Public Schools / Ankrom Moisan Architects"
note: "Irvington: 'the media center and cafeteria are located in inaccessible levels. Priority should be given to providing an elevator for multi-floor access.' Lists elevator to basement and second floor, accessible restrooms in basement and on second floor. $640,071 total (2009). Uses the address 1320 NE Brazee Street."
---

# Irvington Accessibility Summary (Ankrom Moisan Architects for PPS, August 2009)

Unofficial text extraction (poppler pdftotext -layout) for research; may contain extraction errors. Consult the original.

```
               PORTLAND PUBLIC SCHOOLS


                                                                                         IRVINGTON
                                                                               ACCESSIBILITY SUMMARY
                                     ACCESSIBILITY UPGRADES TO MEET 2008 ADA GUIDELINES
                                     Site Elements             Accessible exterior handrails

                                     Accessible Route          Elevator to access basement and second floors
                                     & Reach Ranges            Accessible handrails at one full height staircase
                                                               Classroom lever door hardware
                                                               Exterior compliant stair handrails
Irvington School                                               Accessible handrails at Cafeteria
1320 NE Brazee Street                Plumbing                  Accessible boys and girls restrooms in basement
Portland, OR 97212                   Elements                  Accessible boys and girls restrooms at second floor
                                                               Accessible drinking fountains at basement and second
                                                               floor
SUMMARY
Some common areas at Irvington       Communication             Assisted listening devices at gymnasium
                                     Elements                  Signage
are located on the ground floor,
but the media center and             Built-In Elements         Accessible benches
cafeteria are located in
inaccessible levels. Priority        Recreational              Soft surfacing at play area
should be given to providing an      Facilities
elevator for multi-floor access at
this school. The elevator, door
hardware and plumbing on floors
other than the main level
comprise the majority of the
upgrade work. The major
accessibility upgrades for
Irvington are summarized on this
sheet.
                                     COST BREAKDOWN
This room without windows at         Cost information provided is based on 2009 estimated unit costs for direct
Irvington is a good example which    construction including general contractor overhead. Additionally, estimated hard
illustrate poor classrooms that      costs and soft costs provided by PPS have been included.
have been in-filled into former
courtyard spaces, and have no        Site Elements                                    $19,088
natural light or alternate egress.   Accessible Route & Reach Ranges                 $537,139

                                     Plumbing Elements                                $50,049
                                     Communication Elements                           $12,798
                                     Special Spaces                                            $0

                                     Built-In Elements                                  $4,100
                                     Recreational Facilities                          $14,556
                                     Special Education                                  $2,340
                                     Total                                           $640,071

Internal Rooms, No Natural Light
                                                                  ANKROM MOISAN ARCHITECTS | AUGUST 2009
```
